Rubidoux High School


Introduction

School Info

Rubidoux High School is located on 4250 Opal Street Jurupa Valley, CA 92509 and was originally built in 1959 and was renovated in 2018. Rubidoux High currently sits on 60 site acreage with 182,911 square feet of building area. There are 55 buildings on site, at 1 story in height, built of steel frame structure on concrete slab.  The Modular building are built of conventional wood frame structure with semi-permanent foundations and wood-framed roofs.

Rubidoux High School has opened its doors in 1959 as the first high school in the “West Riverside” area. The school mascot is Freddy, the Falcon. The football field and stadium was named Edward E. Hawkins Stadium after a prominent community member and former superintendent of the school district.

 

Mission Statement

Our Vision ​

To provide a safe and dynamic learning environment through collaboration with students, staff, parents, and the community.  Our high expectations challenge all students to realize their full academic potential and become successful, contributing members of Rubidoux High School and Society.

​Seekers

  • ​Seek knowledge and new learning experiences
  • Seek and evaluate multiple solutions to a problem
  • Seek a variety of ways to communicate your thoughts and solutions

Outstanding Citizens

  • ​Demonstrate respect through compassion, tolerance, and integrity
  • Respect yourself and others
  • Work with others, respecting their thoughts and opinions

Achievers

  • Challenge yourself to achieve your full academic potential
  • Set and achieve worthwhile personal goals
  • Achieve and maintain wellness

Responsible Individuals

  • Responsible for your own lifelong education and growth
  • Responsible for you own choices
  • Responsible for contributing to the advancement of your school, community, state, nation, and world

Perseverance ~ Respect ~ Integrity ~ Dedication to Excellence

 

Site Data
Current Grade Configuration 9-12
Site Acreage 60 Acres
Building Area 182,911 SF
Parking Spaces 765
Year Built 1959
Permanent Classrooms 65
Portable Classrooms 10
Total Classrooms 75
Current Enrollment (2019-2020) 1,551
Projected Enrollment (2029) 1,252
Total Capacity 2,025

Plans

Aerial
Existing
Future

Capacity Assessments


Facility Assessments

FCA Report

Probable Cost

Cost Summary